CfT: TD/T/3748/2023 (10437) - SUPPLY, INSTALLATION AND COMMISSIONING OF 132KV AND 33kV CABLE CIRCUITS FROM MOSTA TO MAGHTAB AND PEMBROKE DISTRIBUTION CENTRES IN AN ENVIRONMENTALLY FRIENDLY MANNER
| Displaying: 1-10 | 16 results in total.
Addendum ID![]()
|
Title![]()
|
File![]()
|
Description![]()
|
Actions |
|---|---|---|---|---|
| 7 | Attachment C - Tunnel A Photos | Attachment C - Tunnel A Photos.pdf | An identical copy of this attachment is being re-published because some tenderers may find a problem to open it due to encryption which the previous file had. | |
| 8 | Attachment D - Tunnel B Photos | Attachment D - Tunnel B Photos.pdf | An identical copy of this attachment is being re-published because some tenderers may find a problem to open it due to encryption which the previous file had. | |
| 3 | Attachments A and E | Attachments A and E - updated versions.zip | Including both 132kV and 33kV cable circuits | |
| N/A | CFT Document | CFT Documents.zip | ||
| 1 | Clarification Note 3 | Clarification Note 3.pdf | A Second Clarification Meeting/Site Visit is being held on 14/03/2024; The Deadline for request for any additional information from the Contracting Authority is being extended to 20/03/2024; and the Tender submission deadline is being extended to 11/04/2024 | |
| 2 | Clarification Note 4 | Clarification Note 4.docx | Technical Clarifications | |
| 4 | Clarification Note 6 | Clarification Note 6.docx | ||
| 5 | Clarification Note 7 | Clarification Note 7.pdf | ||
| 6 | Clarification Note 8 - Corrigendum to Clarification 7 | Clarification Note 8 - Corrigendum to Clarification 7.pdf | ||
| N/A | Drawings | Drawings.zip |